Skip to content


When it rains, we demolish


We looked around the kitchen and decided the cupboards had to go.


We started disassembling the cupboards that were attached to the ceiling and decided the ceiling would look better with drywall. So down it came too.


As we started removing the ceiling in the kitchen we realized the ceiling in the main room should go too.


Gary uses his stilts to remove the tiles and molding.


The previous owner had told us of a fire that happened in the oldest part of the house a long time ago, and once we removed the tiles it was obvious where it occured.


We took apart the chimney and stove area in the kitchen.


Panelling had to go.


By the end of the day, the dust was flying. Now we rebuild.

Posted in 910.

0 Responses

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

Some HTML is OK

(required)

(required, but never shared)

or, reply to this post via trackback.